To allow for the removal of the Boardman Place building, a portion of "F" lot will closed beginning Tuesday, October 13.
Ithaca College will no longer lease this modular building. The owner will be moviing the structure to a new location. This work should last no longer than 3 weeks. A new parking area will be constructed where the building now stands. It will be available sometime in the spring of 2010.
https://www.ithaca.edu/intercom/article.php/20091012160741991