Intercom

intercom home  |  advanced search  |  about intercom  |  alerts  |  faq  |  help     Search Intercom

Renovation of Textor Hall rooms 101, 102, and 103 is scheduled to begin on Wednesday, May 21.

The work will consist of removal of the existing equipment and finishes and installation of new lighting, ceilings, floor coverings, seating, and technology. In addition, room 102 will be modified to make it fully handicapped accessible.

The corridor outside these rooms will remain open throughout the work; minor restrictions may be required at times. The work is scheduled to be completed by August 15.

Please direct any questions regarding this, or any other construction on campus, to Jeff Paddock, director of planning, design, and construction, at 274-3763.

Renovation of Textor Lecture Halls | 0 Comments |
The following comments are the opinions of the individuals who posted them. They do not necessarily represent the position of Intercom or Ithaca College, and the editors reserve the right to monitor and delete comments that violate College policies.