sections |
The area of the first floor of the Muller Facuilty Center vacated by Information Technology Services is being renovated to become the new home of the Office of Career Services. Major work will begin on Monday, March 15. The area of the Concourse passing through Muller will remain open at all times. Every effort will be made to minimize noise and dirt associated with the work but this is a construction site and there will be some disturbance at times. We regret any inconvenience. Work is expected to be complete by early May. |
© Copyright Ithaca College. All rights reserved; unauthorized use prohibited. All material on this server is produced by our community but, except for designated pages, is neither approved nor verified by Ithaca College.