sections |
"This has been the first major renovation of this building since it was built some 30 years ago, and the work was done entirely by the physical plant staff members," Couture said. "That includes the planning, design, and construction phases. This ceremony is a testament to the quality of work done by the talented people who work in every department of the physical plant office." The refurbishing took about a year and a half to complete and includes renovations to the reception area, conference room, and offices. In addition, a new dispatch area was built and new windows installed throughout the building. Contributed by Keith Davis |
© Copyright Ithaca College. All rights reserved; unauthorized use prohibited. All material on this server is produced by our community but, except for designated pages, is neither approved nor verified by Ithaca College.